PR 1 6.0 KM over CONCEPCION STREET
FIRST BGE E INT PR2 & · County 127, Puerto Rico · Built 1971 · 8 Lanes · 33,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.441631, -66.074072
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
RAMP PR 22 TO PR 1 over NATURAL SOIL DEPRESSION
Built 1979
PR 22 over PR 1
Built 1971
RAMP PR 1 TO PR 22 over PR 22
Built 1979
PR 22 STHBD 1.9 KM over MARTIN PE¥A CHANNEL
Built 1980
PR 1 PR 22 .2 KM over DEPRESSION
Built 1979
PR 1 over PR 2
Built 1971
RAMP PR 1 TO PR 22 over RAMP MARGINAL ST TO PR 1
Built 1979
PR 22 NRBD 1.7 KM over MARTIN PE¥A CHANNEL
Built 1970
RAMP PR 2 TO PR 1 over PR 2
Built 1966
RAMP PR 22 TO PR 1 over RAMP PR 1 TO L A STREET
Built 1979
Bridge Details
- Structure #
- 009111
- Year Built
- 1971
- Length
- 41 m (134.5 ft)
- Max Span
- 11.3 m
- Width
- 40 m (131.2 ft)
- Lanes
- 8
- Daily Traffic
- 33,900
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.