PR 1 over PR 2
NORTH MARTIN PE¥A CH · County 127, Puerto Rico · Built 1971 · 6 Lanes · 33,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.443014, -66.078444
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
RAMP PR 2 TO PR 1 over PR 2
Built 1966
PR 1 6.0 KM over CONCEPCION STREET
Built 1971
PR 2 1.5 KM over MARTIN PE¥A CHANNEL
Built 1954
PRUDENCIO RIVERA over AQUA EXPRESO CHANNEL
Built 1990
RAMP PR 22 TO PR 1 over NATURAL SOIL DEPRESSION
Built 1979
RAMP PR 1 TO PR 22 over PR 22
Built 1979
PR 22 over PR 1
Built 1971
PR 22 STHBD 1.9 KM over MARTIN PE¥A CHANNEL
Built 1980
PR 1 PR 22 .2 KM over DEPRESSION
Built 1979
PR 22 NRBD 1.7 KM over MARTIN PE¥A CHANNEL
Built 1970
Bridge Details
- Structure #
- 019981
- Year Built
- 1971
- Length
- 147.5 m (483.9 ft)
- Max Span
- 27.7 m
- Width
- 30.9 m (101.4 ft)
- Lanes
- 6
- Daily Traffic
- 33,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $88,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.