PR 22 STHBD 1.9 KM over MARTIN PE¥A CHANNEL

1.9 KM OF INT PR26 & · County 127, Puerto Rico · Built 1980 · 4 Lanes · 58,525 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
020882
Year Built
1980
Length
619.2 m (2031.5 ft)
Max Span
36.1 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
58,525
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$493,000
Total Project Cost
$822,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.