PR 1 3.4 KM over PR 35 0.1 KM
MIRAMAR SAN JUAN · County 127, Puerto Rico · Built 1958 · 5 Lanes · 45,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.435906, -66.059897
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 68 years old.
Nearby Bridges
RAMP PR 25 TO PR 1 over PR 35
Built 2000
PR 1 7.4 KM over SGRDO CRZON ST 0.1 KM
Built 2000
PR 1 7.4 KM over SAGRADO CORAZON STREET
Built 1971
PR 25 8.0 KM over MARTIN PE¥A CHANNEL
Built 1939
PR 1 over MARTIN PE¥A CHANNEL
Built 1953
PR 1 over LOS ANGELES STREET
Built 1971
RAMP PR 22 TO PR 1 over RAMP PR 1 TO L A STREET
Built 1979
RAMP PR 1 TO PR 22 over RAMP MARGINAL ST TO PR 1
Built 1979
PR 1 PR 22 .2 KM over DEPRESSION
Built 1979
PR 22 NRBD 1.7 KM over MARTIN PE¥A CHANNEL
Built 1970
Bridge Details
- Structure #
- 007441
- Year Built
- 1958
- Length
- 12.1 m (39.7 ft)
- Max Span
- 12.1 m
- Width
- 29.5 m (96.8 ft)
- Lanes
- 5
- Daily Traffic
- 45,400
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.