SUTY ROAD over IRRIGATION CANAL
007 MI S OF HWY 50 · County 035, Oregon · Built 1974 · 2 Lanes · 74 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.004589, -121.463239
This bridge is in worse condition than 80.6% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 52 years old.
Nearby Bridges
HARPOLD ROAD over J IRRIGATION CANAL
Built 1979
STATE LINE RD over DRAINAGE DITCH
Built 1971
GAINES ROAD over J IRRIGATION CANAL
Built 1979
MCCULLEY ROAD over JIRRIGATION CANAL
Built 1979
PAYGER ROAD over D IRRIGATION CANAL
Built 1993
SO.ADAMS POINT RD. over J IRRIGATION CANAL
Built 1979
HARPOLD RD over IRRIGATION CANAL
Built 1960
STATE LINE RD over IRRIGATION CANAL
Built 1969
WILSON RD over IRRIGATION CANAL
Built 1978
NO. ADAMS POINT RD over IRRIGATION CANAL
Built 1980
Bridge Details
- Structure #
- 35C196111100070
- Year Built
- 1974
- Length
- 14 m (45.9 ft)
- Max Span
- 13.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 74
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.