HARPOLD ROAD over J IRRIGATION CANAL
005 MI S OF HWY 50 · County 035, Oregon · Built 1979 · 2 Lanes · 409 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.0033, -121.447864
This bridge is in worse condition than 9.3% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 47 years old.
Nearby Bridges
STATE LINE RD over DRAINAGE DITCH
Built 1971
SUTY ROAD over IRRIGATION CANAL
Built 1974
MCCULLEY ROAD over JIRRIGATION CANAL
Built 1979
STATE LINE RD over IRRIGATION CANAL
Built 1969
GAINES ROAD over J IRRIGATION CANAL
Built 1979
HARPOLD RD over IRRIGATION CANAL
Built 1960
DRAZIL RD over D IRRIGATION CANAL
Built 1979
COUNTY ROAD 112 over J CANAL
Built 1940
6th Street over D CANAL
Built 2000
PAYGER ROAD over D IRRIGATION CANAL
Built 1993
Bridge Details
- Structure #
- 35C134109700070
- Year Built
- 1979
- Length
- 14.3 m (46.9 ft)
- Max Span
- 13.7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 409
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.