WILSON RD over IRRIGATION CANAL
008 MI S OF HWY 50 · County 035, Oregon · Built 1978 · 2 Lanes · 127 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.007667, -121.512197
This bridge is in worse condition than 40.7% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 48 years old.
Nearby Bridges
SO.ADAMS POINT RD. over J IRRIGATION CANAL
Built 1979
STATE ROUTE 161 over LOST RIVER
Built 2008
OR 39 (HWY 426) over USRS CANAL J
Built 1982
GAINES ROAD over J IRRIGATION CANAL
Built 1979
POPE ROAD over IRRIGATION CANAL
Built 1978
NO. ADAMS POINT RD over IRRIGATION CANAL
Built 1980
DODDS HOLLOW over IRRIGATION CANAL
Built 1971
MALONE ROAD over LOST RIVER
Built 1989
SUTY ROAD over IRRIGATION CANAL
Built 1974
PAYGER ROAD over D IRRIGATION CANAL
Built 1993
Bridge Details
- Structure #
- 35C209110500080
- Year Built
- 1978
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.3 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 127
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.