NO. ADAMS POINT RD over IRRIGATION CANAL
009 MI N OF HWY 50 · County 035, Oregon · Built 1980 · 2 Lanes · 112 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.029633, -121.50265
This bridge is in worse condition than 40.7% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 46 years old.
Nearby Bridges
POPE ROAD over IRRIGATION CANAL
Built 1978
SO.ADAMS POINT RD. over J IRRIGATION CANAL
Built 1979
PAYGER ROAD over D IRRIGATION CANAL
Built 1993
WILSON RD over IRRIGATION CANAL
Built 1978
GAINES ROAD over J IRRIGATION CANAL
Built 1979
OR 39 (HWY 426) over USRS CANAL J
Built 1982
DODDS HOLLOW over IRRIGATION CANAL
Built 1971
STATE ROUTE 161 over LOST RIVER
Built 2008
SUTY ROAD over IRRIGATION CANAL
Built 1974
HARPOLD RD over IRRIGATION CANAL
Built 1960
Bridge Details
- Structure #
- 35C101109900090
- Year Built
- 1980
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 112
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.