DODDS HOLLOW over IRRIGATION CANAL
002 MI N OF MALIN HWY · County 035, Oregon · Built 1971 · 2 Lanes · 491 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.027353, -121.546283
This bridge is in worse condition than 40.7% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 55 years old.
Nearby Bridges
MALONE ROAD over D IRRIGATION CANAL
Built 1985
POPE ROAD over IRRIGATION CANAL
Built 1978
ANDERSON RD over IRRIGATION CANAL
Built 1981
MALONE ROAD over LOST RIVER
Built 1989
OR 39 (HWY 426) over USRS CANAL J
Built 1982
WILSON RD over IRRIGATION CANAL
Built 1978
NO. ADAMS POINT RD over IRRIGATION CANAL
Built 1980
STATE ROUTE 161 over LOST RIVER
Built 2008
SO.ADAMS POINT RD. over J IRRIGATION CANAL
Built 1979
SOUTH MERRILL ROAD over LOST RIVER
Built 2015
Bridge Details
- Structure #
- 35C124109100020
- Year Built
- 1971
- Length
- 12.8 m (42 ft)
- Max Span
- 12.2 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 491
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.