SW 56TH AVE over B-70 OVER FANNO CREEK

N OF HWY 10 · County 051, Oregon · Built 1980 · 2 Lanes · 404 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
25B70 000 00000
Year Built
1980
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
404
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.