1C from NB I-5 over SW Terwilliger Blvd.
1.7 M S OF ROSS ISL. BR. · County 051, Oregon · Built 1993 · 2 Lanes · 6,649 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
45.453536, -122.721292
This bridge is in worse condition than 74.6% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 33 years old.
Nearby Bridges
I-5 Ramp over SW 4th Street.
Built 1993
HWY 91 over HWY 1
Built 1959
HY 91 SB TO 1 SB over HWY 1 SB OFF RAMP
Built 1959
HWY 91 over SW 26TH AVE
Built 1958
I-5 (HWY 001) over SW 26TH AVE
Built 2024
SW CAPITOL HIGHWAY over B-82 X SW MULTNOMAH BLVD
Built 1927
OR 99W (HWY 91) over HWY 1W NB TO HWY 1 NB
Built 1985
HWY 1W NB TO 1 NB over I-5 (HWY 001)
Built 1985
SPRING GARDEN RD over I-5 (HWY 001)
Built 1959
OR 99W (HWY 001W) over SW MULTNOMAH BLVD
Built 1935
Bridge Details
- Structure #
- 08392D001C29709
- Year Built
- 1993
- Length
- 88.4 m (290 ft)
- Max Span
- 39.6 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,649
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.