SW CAPITOL HIGHWAY over B-82 X SW MULTNOMAH BLVD
MULTNOMAH VILLAGE · County 051, Oregon · Built 1927 · 2 Lanes · 12,976 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.467328, -122.715614
This bridge is in worse condition than 12.5% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 99 years old.
Nearby Bridges
HWY 91 over SW 26TH AVE
Built 1958
I-5 (HWY 001) over SW 26TH AVE
Built 2024
OR 99W (HWY 001W) over SW MULTNOMAH BLVD
Built 1935
SPRING GARDEN RD over I-5 (HWY 001)
Built 1959
SW 19th Ave over Hwy 001
Built 1959
Multnomah Blvd over Hwy 001
Built 1959
HY 91 SB TO 1 SB over HWY 1 SB OFF RAMP
Built 1959
HWY 91 over HWY 1
Built 1959
I-5 Ramp over SW 4th Street.
Built 1993
1C from NB I-5 over SW Terwilliger Blvd.
Built 1993
Bridge Details
- Structure #
- 25T03 000 00117
- Year Built
- 1927
- Length
- 94.2 m (309.1 ft)
- Max Span
- 18.6 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 12,976
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $989,000
- Total Project Cost
- $1,583,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.