SW 19th Ave over Hwy 001
1.4 M N OF BARBUR BLVD · County 051, Oregon · Built 1959 · 2 Lanes · 99,796 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.464572, -122.697289
This bridge is in worse condition than 12.5% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 67 years old.
Nearby Bridges
Multnomah Blvd over Hwy 001
Built 1959
OR 99W (HWY 001W) over SW MULTNOMAH BLVD
Built 1935
SPRING GARDEN RD over I-5 (HWY 001)
Built 1959
I-5 (HWY 001) over SW 26TH AVE
Built 2024
HWY 91 over SW 26TH AVE
Built 1958
1W To Hwy 1 NB over SW Terwilliger Blvd.
Built 1993
Hwy91C to Hwy1NB over SW Terwilliger Blvd.
Built 1993
Terwilliger Blvd. over Hwy 001
Built 1993
SW CAPITOL HIGHWAY over B-82 X SW MULTNOMAH BLVD
Built 1927
SW CAPITOL HIGHWAY over B-81 OVER SW BERTHA BLVD
Built 1915
Bridge Details
- Structure #
- 08201 001 29646
- Year Built
- 1959
- Length
- 118.1 m (387.5 ft)
- Max Span
- 25.3 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 99,796
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,688,000
- Total Project Cost
- $2,701,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.