Denny Allen FR Rd over Fanno Creek

0.3 MI S OF CABOT ST · County 067, Oregon · Built 2023 · 2 Lanes · 21,548 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
23235144CD00285
Year Built
2023
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
21,548
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.