OLESON ROAD over FANNO CREEK

005 MI S HWY 10 · County 067, Oregon · Built 2015 · 2 Lanes · 12,127 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
22191 000 00274
Year Built
2015
Length
29.9 m (98.1 ft)
Max Span
29.9 m
Width
19.7 m (64.6 ft)
Lanes
2
Daily Traffic
12,127
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$187,000
Total Project Cost
$299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.