US 26 (Hwy 047)CON over Hwy 29 Canyon Road
3.7 MI W OF PORTLAND CC · County 067, Oregon · Built 2002 · 1 Lanes · 5,307 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
45.507083, -122.744967
This bridge is in worse condition than 12% of bridges in County 067. The average bridge in Oregon is 0 years old; this one is 24 years old.
Nearby Bridges
US 26 (Hwy 047) over Hwy 29 Canyon Road
Built 2004
CEM.ACC.RD-CAMELOT over Hwy 47 US 26
Built 1999
Sylvan Connection over Hwy 47 US 26
Built 2002
Highland Rd Intchg over Hwy 47 US 26
Built 1995
OLESON ROAD over FANNO CREEK
Built 2015
US 26 (HWY 047) CO over BARNES RD CONN
Built 1985
US 26 (HWY 047) over HWY 144
Built 1986
CONN 2 (PARKWAY)CO over HWY 144
Built 1971
US 26 (Hwy 047)CON over Light Rail Transit
Built 1996
CORNELL ROAD over B-124 (3RD W. OF TUNNEL)
Built 1986
Bridge Details
- Structure #
- 18647 047C07083
- Year Built
- 2002
- Length
- 183.2 m (601 ft)
- Max Span
- 67.7 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 1
- Daily Traffic
- 5,307
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,909,000
- Total Project Cost
- $3,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.