US 26 (HWY 047) over HWY 144

5.3 MI W OF PORTLAND CC · County 067, Oregon · Built 1986 · 9 Lanes · 133,089 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06980A047 06919
Year Built
1986
Length
74.6 m (244.8 ft)
Max Span
27.3 m
Width
53 m (173.9 ft)
Lanes
9
Daily Traffic
133,089
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,626,000
Total Project Cost
$7,401,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.