HIGBEE ROAD over SANTIAM OFLOW

S OF SANTIAM RIVER · County 043, Oregon · Built 2000 · 2 Lanes · 41 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
18812 705 00000
Year Built
2000
Length
60.2 m (197.5 ft)
Max Span
12 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
41
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.