HIGBEE ROAD over SANTIAM OFLOW
S OF SANTIAM RIVER · County 043, Oregon · Built 2000 · 2 Lanes · 41 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.724981, -123.051081
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 26 years old.
Nearby Bridges
I-5 (Hwy 1) NB over Santiam Overflow No. 6
Built 2001
I-5 (Hwy 1) SB over Santiam Overflow No. 6
Built 2003
Dever-Conner Road over I-5 (Hwy 1)
Built 1958
I-5 (Hwy 1) SB over Santiam Overflow No. 10
Built 2003
I-5 (Hwy 1) SB over Santiam Overflow No. 5
Built 2003
I-5 (Hwy 1) NB over Santiam Overflow No. 7
Built 2001
I-5 (Hwy 1) SB over Santiam Overflow No. 7
Built 2003
I-5 (Hwy 1) NB over Santiam Overflow No. 4
Built 1994
I-5 (Hwy 1) SB over Santiam Overflow No. 3
Built 1958
I-5 (Hwy 1) Fr Rd over Santiam Overflow No. 1
Built 1958
Bridge Details
- Structure #
- 18812 705 00000
- Year Built
- 2000
- Length
- 60.2 m (197.5 ft)
- Max Span
- 12 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 41
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.