I-5 (Hwy 1) SB over Santiam Overflow No. 3

069 MI N OF ALBANY NCL · County 047, Oregon · Built 1958 · 3 Lanes · 33,446 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
08122 001 24112
Year Built
1958
Reconstructed
1991
Length
32.9 m (107.9 ft)
Max Span
11 m
Width
25.8 m (84.6 ft)
Lanes
3
Daily Traffic
33,446
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.