I-5 (Hwy 1) Conn over Santiam Overflow No. 3

1/2 N OF SANTIAM RIVER · County 047, Oregon · Built 1992 · 2 Lanes · 1,482 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
17191 001 24112
Year Built
1992
Length
42.7 m (140.1 ft)
Max Span
17.1 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
1,482
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.