I-5 (Hwy 1) Fr Rd over Santiam Overflow No. 1

075 MI N OF ALBANY NCL · County 047, Oregon · Built 1958 · 2 Lanes · 116 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
08363 001F24166
Year Built
1958
Length
35.7 m (117.1 ft)
Max Span
11.9 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
116
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000
Total Project Cost
$599,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.