I-5 (Hwy 1) SB over Santiam River
065 MI N OF ALBANY NCL · County 047, Oregon · Built 1991 · 2 Lanes · 33,446 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
44.736656, -123.053233
This bridge is in worse condition than 78.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 35 years old.
Nearby Bridges
I-5 (Hwy 1) NB over Santiam River
Built 1995
I-5 (Hwy 1) Fr Rd over Santiam Overflow No. 1
Built 1958
I-5 (Hwy 1) SB over Santiam Overflow No. 3
Built 1958
I-5 (Hwy 1) NB over Santiam Overflow No. 4
Built 1994
I-5 (Hwy 1) SB over Santiam Overflow No. 2
Built 1958
I-5 (Hwy 1) NB over Santiam Overflow No. 1
Built 2001
I-5 (Hwy 1) Conn over Santiam Overflow No. 3
Built 1992
I-5 (Hwy 1) SB over Santiam Overflow No. 5
Built 2003
I-5 (Hwy 1) SB over Santiam Overflow No. 10
Built 2003
I-5 (Hwy 1) NB over Santiam Overflow No. 3
Built 1994
Bridge Details
- Structure #
- 08123D001 24066
- Year Built
- 1991
- Length
- 262.1 m (859.9 ft)
- Max Span
- 73.2 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 2
- Daily Traffic
- 33,446
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,754,000
- Total Project Cost
- $4,406,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.