I-5 (Hwy 1) NB over Santiam Overflow No. 1
075 MI N OF ALBANY NCL · County 047, Oregon · Built 2001 · 2 Lanes · 33,486 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.737225, -123.053064
This bridge is in worse condition than 25.9% of bridges in County 047. The average bridge in Oregon is 0 years old; this one is 25 years old.
Nearby Bridges
I-5 (Hwy 1) SB over Santiam Overflow No. 2
Built 1958
I-5 (Hwy 1) Fr Rd over Santiam Overflow No. 1
Built 1958
I-5 (Hwy 1) NB over Santiam River
Built 1995
I-5 (Hwy 1) SB over Santiam River
Built 1991
I-5 (Hwy 1) Conn over Santiam Overflow No. 3
Built 1992
I-5 (Hwy 1) NB over Santiam Overflow No. 4
Built 1994
I-5 (Hwy 1) SB over Santiam Overflow No. 3
Built 1958
I-5 (Hwy 1) SB over Santiam Overflow No. 5
Built 2003
I-5 (Hwy 1) SB over Santiam Overflow No. 10
Built 2003
I-5 (Hwy 1) NB over Chehulpum Creek
Built 2001
Bridge Details
- Structure #
- 18353 001 24170
- Year Built
- 2001
- Length
- 36 m (118.1 ft)
- Max Span
- 12 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 33,486
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.