Dever-Conner Road over I-5 (Hwy 1)
055 MI N OF ALBANY · County 043, Oregon · Built 1958 · 2 Lanes · 66,723 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.722628, -123.053925
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 68 years old.
Nearby Bridges
I-5 (Hwy 1) NB over Santiam Overflow No. 6
Built 2001
I-5 (Hwy 1) SB over Santiam Overflow No. 6
Built 2003
HIGBEE ROAD over SANTIAM OFLOW
Built 2000
I-5 (Hwy 1) NB over Santiam Overflow No. 7
Built 2001
I-5 (Hwy 1) SB over Santiam Overflow No. 7
Built 2003
I-5 (Hwy 1) SB over Santiam Overflow No. 10
Built 2003
I-5 (Hwy 1) SB over Santiam Overflow No. 5
Built 2003
HOEFER ROAD over OVERFLOW
Built 2007
I-5 (Hwy 1) SB over Santiam Overflow No. 3
Built 1958
I-5 (Hwy 1) NB over Santiam Overflow No. 4
Built 1994
Bridge Details
- Structure #
- 08130 001 23967
- Year Built
- 1958
- Length
- 92.7 m (304.1 ft)
- Max Span
- 25.6 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 66,723
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.