I-5 (Hwy 1) NB over Santiam Overflow No. 7

052 MI N OF ALBANY NCL · County 043, Oregon · Built 2001 · 2 Lanes · 33,361 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
18348 001 23935
Year Built
2001
Length
60 m (196.9 ft)
Max Span
12 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
33,361
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.