RTE 907W over SECOR LANE
0.2 MI N JCT RTS HRP <US1 · County 119, New York · Built 1925 · 4 Lanes · 89,029 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.895211, -73.816836
This bridge is in worse condition than 59.3% of bridges in County 119. The average bridge in New York is 0 years old; this one is 101 years old.
Nearby Bridges
RTE 907W over RTE 1
Built 1933
FULTON AVENUE over HUTCHINSON RIVER
Built 1974
SB HRP RAMP FROM S over HUTCHINSON RIVER
Built 1987
SANFORD BOULEVARD over HUTCHINSON RIVER
Built 1928
RTE 907W over COLONIAL AVE
Built 1987
RTE I95 over 908AX RTE 908A
Built 1957
RTE 1 over Boston Post Local Road t
Built 1965
RTE I95 over HOLLERS AVENUE EASTCHES
Built 1995
EAST 3RD ST over 907W 907W87011012 RTE 9
Built 2018
RAMP TO THIRD ST over HUTCHINSON RIVER
Built 1987
Bridge Details
- Structure #
- 000000005500029
- Year Built
- 1925
- Length
- 16.8 m (55.1 ft)
- Max Span
- 15.8 m
- Width
- 20 m (65.6 ft)
- Lanes
- 4
- Daily Traffic
- 89,029
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,123,000
- Total Project Cost
- $3,366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.