SB HRP RAMP FROM S over HUTCHINSON RIVER

0.7 MI N JCT HRP & US 1 · County 119, New York · Built 1987 · 3 Lanes

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005523489
Year Built
1987
Length
18.6 m (61 ft)
Max Span
17.9 m
Width
14.8 m (48.6 ft)
Lanes
3
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,445,000
Total Project Cost
$3,877,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.