RTE 907W over HUTCHINSON RIVER
1.3 MI N JCT RTS HRP<1 · County 119, New York · Built 2018 · 4 Lanes · 92,620 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
40.911392, -73.813828
This bridge is in worse condition than 15.6% of bridges in County 119. The average bridge in New York is 0 years old; this one is 8 years old.
Nearby Bridges
RAMP FROM HRP SB over HUTCHINSON RIVER
Built 1987
RTE 907W over HUTCHINSON RIVER
Built 1926
RAMP R FROM HRP NB over HUTCHINSON RIVER
Built 2022
Lincoln Ave over Hutchinson River 907W 9
Built 2021
RAMP TO THIRD ST over HUTCHINSON RIVER
Built 1987
EAST 3RD ST over 907W 907W87011012 RTE 9
Built 2018
1ST AVE RAMP -HRP over HUTCHINSON RIVER
Built 1987
RTE 907W over COLONIAL AVE
Built 1987
SANFORD BOULEVARD over HUTCHINSON RIVER
Built 1928
SB HRP RAMP FROM S over HUTCHINSON RIVER
Built 1987
Bridge Details
- Structure #
- 000000005500089
- Year Built
- 2018
- Length
- 10.4 m (34.1 ft)
- Max Span
- 9.8 m
- Width
- 24.1 m (79.1 ft)
- Lanes
- 4
- Daily Traffic
- 92,620
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,148,000
- Total Project Cost
- $1,821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.