EAST 3RD ST over 907W 907W87011012 RTE 9
AT PELHAM · County 119, New York · Built 2018 · 2 Lanes · 8,326 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
40.906139, -73.813547
This bridge is in worse condition than 9.9% of bridges in County 119. The average bridge in New York is 0 years old; this one is 8 years old.
Nearby Bridges
RAMP TO THIRD ST over HUTCHINSON RIVER
Built 1987
RTE 907W over COLONIAL AVE
Built 1987
SANFORD BOULEVARD over HUTCHINSON RIVER
Built 1928
RAMP FROM HRP SB over HUTCHINSON RIVER
Built 1987
SB HRP RAMP FROM S over HUTCHINSON RIVER
Built 1987
RTE 907W over HUTCHINSON RIVER
Built 2018
RTE 907W over HUTCHINSON RIVER
Built 1926
RAMP R FROM HRP NB over HUTCHINSON RIVER
Built 2022
Lincoln Ave over Hutchinson River 907W 9
Built 2021
EAST 3RD STREET over UNIVERSAL METAL BUILDING
Built 1912
Bridge Details
- Structure #
- 000000005500050
- Year Built
- 2018
- Length
- 62.5 m (205.1 ft)
- Max Span
- 39 m
- Width
- 18.4 m (60.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,326
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,424,000
- Total Project Cost
- $10,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.