RTE I95 over 908AX RTE 908A
5.0 MI NW I295&I95 · County 005, New York · Built 1957 · 7 Lanes · 76,473 vehicles/day
Overall
Deck
9
Excellent
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.886642, -73.8152
This bridge is in worse condition than 55.9% of bridges in County 005. The average bridge in New York is 0 years old; this one is 69 years old.
Nearby Bridges
RTE I95 over HOLLERS AVENUE EASTCHES
Built 1995
RTE 907W over RTE 1
Built 1933
RTE 1 over Boston Post Local Road t
Built 1965
CONNER ST over 95IX RTE I95
Built 1956
RTE 907W over SECOR LANE
Built 1925
FULTON AVENUE over HUTCHINSON RIVER
Built 1974
RTE I95 over PELHAMDALE AVE
Built 1954
RTE I95 over PELHAM COUNTRY CLUB RD
Built 1954
ORCHARD BEACH RD over RTE 908A RTE 908A
Built 1940
SB HRP RAMP FROM S over HUTCHINSON RIVER
Built 1987
Bridge Details
- Structure #
- 000000005075449
- Year Built
- 1957
- Reconstructed
- 2008
- Length
- 27.4 m (89.9 ft)
- Max Span
- 27.4 m
- Width
- 33.4 m (109.6 ft)
- Lanes
- 7
- Daily Traffic
- 76,473
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $14,084,000
- Total Project Cost
- $22,331,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.