RTE 1 over Boston Post Local Road t

JCT US1+HUTCHINSON RIVER · County 005, New York · Built 1965 · 4 Lanes · 18,996 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000002229579
Year Built
1965
Reconstructed
1986
Length
415.4 m (1362.9 ft)
Max Span
43.2 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
18,996
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$45,391,000
Total Project Cost
$71,972,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.