BAYCHESTERAV RAMP over RTE I95

2.8 MI NW JCT I295 & I95 · County 005, New York · Built 1956 · 1 Lanes

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000005076070
Year Built
1956
Length
29 m (95.1 ft)
Max Span
27.7 m
Width
14.6 m (47.9 ft)
Lanes
1
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$4,791,000
Total Project Cost
$7,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.