IRR BIA RTE 5012 over TOCITO WASH
.5KM E BIA 5012 N SANOST · County 045, New Mexico · Built 2022 · 2 Lanes · 500 vehicles/day
Overall
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
36.434917, -108.869444
This bridge is in worse condition than 45.4% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 4 years old.
Nearby Bridges
IRR BIA RTE N5000 over TOCITO WASH
Built 1988
IRR BIA RTE 5000 over TO-BIL-HASK-IDI WASH
Built 2009
US-491 NB over Pena Blanca Wash
Built 2014
IRR/US-491 SB over TOCITO WASH
Built 1980
US-491 NB over TOCITO WASH
Built 2005
IRR RTE 5000 over LEH-TSO-BII-TO WASH
Built 2009
US-491 over PENA BLANCA WASH
Built 1981
IRR/US-491-NBL over Pena Blanca Arroyo
Built 2010
IRR/US-491 over PENA BLANCA ARROYO
Built 1980
Bridge Details
- Structure #
- 0000N32780T0204
- Year Built
- 2022
- Length
- 31.5 m (103.3 ft)
- Max Span
- 30.3 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.