IRR/US-491 over PENA BLANCA ARROYO
1.86 MI N RD TO TOADLENA · County 045, New Mexico · Built 1980 · 2 Lanes · 6,055 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
36.359208, -108.719872
This bridge is in worse condition than 56.9% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 46 years old.
Nearby Bridges
IRR/US-491-NBL over Pena Blanca Arroyo
Built 2010
US-491 over PENA BLANCA WASH
Built 1981
IRR/US-491 SB over TOCITO WASH
Built 1980
US-491 NB over TOCITO WASH
Built 2005
IRR BIA RTE 5000 over TO-BIL-HASK-IDI WASH
Built 2009
IRR BIA RTE N5000 over TOCITO WASH
Built 1988
FR-6662 over CAPTAIN TOM WASH
Built 1979
IRR/US-491 SBL over CAPTAIN TOM WASH
Built 1979
US-491 NBL over Captain Tom Wash
Built 2012
US-491 NB over Pena Blanca Wash
Built 2014
Bridge Details
- Structure #
- 000000000008043
- Year Built
- 1980
- Length
- 39.6 m (129.9 ft)
- Max Span
- 11 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 6,055
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $299,000
- Total Project Cost
- $449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.