US-491 over PENA BLANCA WASH
23.6 miSouth Jct US 64/49 · County 045, New Mexico · Built 1981 · 2 Lanes · 7,932 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
36.364175, -108.720189
This bridge is in worse condition than 56.9% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 45 years old.
Nearby Bridges
IRR/US-491-NBL over Pena Blanca Arroyo
Built 2010
IRR/US-491 over PENA BLANCA ARROYO
Built 1980
IRR/US-491 SB over TOCITO WASH
Built 1980
US-491 NB over TOCITO WASH
Built 2005
IRR BIA RTE N5000 over TOCITO WASH
Built 1988
IRR BIA RTE 5000 over TO-BIL-HASK-IDI WASH
Built 2009
US-491 NB over Pena Blanca Wash
Built 2014
FR-6662 over CAPTAIN TOM WASH
Built 1979
IRR/US-491 SBL over CAPTAIN TOM WASH
Built 1979
US-491 NBL over Captain Tom Wash
Built 2012
Bridge Details
- Structure #
- 000000000008211
- Year Built
- 1981
- Length
- 39.8 m (130.6 ft)
- Max Span
- 19.5 m
- Width
- 14.8 m (48.6 ft)
- Lanes
- 2
- Daily Traffic
- 7,932
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $303,000
- Total Project Cost
- $455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.