IRR BIA RTE N5000 over TOCITO WASH
4 MI WEST OF TOCITO · County 045, New Mexico · Built 1988 · 2 Lanes · 138 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
36.407167, -108.785992
This bridge is in worse condition than 56.9% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 38 years old.
Nearby Bridges
IRR/US-491 SB over TOCITO WASH
Built 1980
US-491 NB over TOCITO WASH
Built 2005
US-491 NB over Pena Blanca Wash
Built 2014
US-491 over PENA BLANCA WASH
Built 1981
IRR/US-491-NBL over Pena Blanca Arroyo
Built 2010
IRR/US-491 over PENA BLANCA ARROYO
Built 1980
IRR BIA RTE 5012 over TOCITO WASH
Built 2022
IRR BIA RTE 5000 over TO-BIL-HASK-IDI WASH
Built 2009
IRR RTE 5000 over LEH-TSO-BII-TO WASH
Built 2009
IRR BIA RTE N5000 over WASH
Built 1995
Bridge Details
- Structure #
- 00000000000N246
- Year Built
- 1988
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.6 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 138
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.