IRR BIA RTE 38 over CANYON LARGO WASH
2.7 KM SOUTH OF MCCARTYS · County 061, New Mexico · Built 1977 · 2 Lanes · 115 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
35.042664, -107.662414
This bridge is in worse condition than 41.7% of bridges in County 061. The average bridge in New Mexico is 0 years old; this one is 49 years old.
Nearby Bridges
IRR BIA RTE 30 over LARGO CANYON WASH
Built 1994
IRR BIA RTE 27 over SAN JOSE RIVER
Built 2010
IRR BIA RTE 30 over SAN JOSE RIVER
Built 2010
IRR BIA RTE 34 over RINCONADA CREEK
Built 2016
IRR/NM-124 over TAFOYA CANYON
Built 1967
IRR/NM-124 over UNNAMED WATERWAY
Built 1936
IRR/I-40 EBL/WBL over TAFOYA CANYON
Built 1967
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1961
06-4026 over UNMD WWAY @ I40 MP 96.01
Built 1967
IRR/NM-124 over RIO SAN JOSE
Built 1937
Bridge Details
- Structure #
- 00000000000M126
- Year Built
- 1977
- Length
- 47.2 m (154.9 ft)
- Max Span
- 15.7 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 115
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $26,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.