IRR/NM-124 over UNNAMED WATERWAY
6.2 MI E OF NM-117 · County 006, New Mexico · Built 1936 · 2 Lanes · 356 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.067392, -107.683653
This bridge is in worse condition than 76.4% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 90 years old.
Nearby Bridges
IRR BIA RTE 30 over SAN JOSE RIVER
Built 2010
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1961
IRR/NM-124 over RIO SAN JOSE
Built 1936
IRR/NM-124 over RIO SAN JOSE
Built 1937
IRR BIA RTE 27 over SAN JOSE RIVER
Built 2010
IRR/NM-124 over TAFOYA CANYON
Built 1967
IRR/I-40 EBL/WBL over TAFOYA CANYON
Built 1967
06-4026 over UNMD WWAY @ I40 MP 96.01
Built 1967
I-40 WBL over Rio San Jose
Built 2016
I-40 EBL over Rio San Jose
Built 2016
Bridge Details
- Structure #
- 000000000003102
- Year Built
- 1936
- Length
- 9.6 m (31.5 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 356
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $50,000
- Total Project Cost
- $75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.