IRR/NM-124 over RIO SAN JOSE
1.68 MI E OF JCT NM-117 · County 006, New Mexico · Built 1937 · 2 Lanes · 356 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.064136, -107.689325
This bridge is in worse condition than 82.7% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 89 years old.
Nearby Bridges
IRR/NM-124 over RIO SAN JOSE
Built 1936
IRR/NM-124 over UNNAMED WATERWAY
Built 1936
IRR BIA RTE 30 over SAN JOSE RIVER
Built 2010
IRR/I-40 EBL/WBL over UNNAMED WATERWAY
Built 1961
IRR BIA RTE 27 over SAN JOSE RIVER
Built 2010
I-40 WBL over Rio San Jose
Built 2016
I-40 EBL over Rio San Jose
Built 2016
IRR/NM-124 over TAFOYA CANYON
Built 1967
IRR/I-40 EBL/WBL over TAFOYA CANYON
Built 1967
06-4026 over UNMD WWAY @ I40 MP 96.01
Built 1967
Bridge Details
- Structure #
- 000000000001776
- Year Built
- 1937
- Length
- 28.3 m (92.8 ft)
- Max Span
- 9.1 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 356
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $250,000
- Total Project Cost
- $501,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.