IRR BIA RTE 34 over RINCONADA CREEK
3.2 KM EAST OF MCCARTYS · County 006, New Mexico · Built 2016 · 2 Lanes · 550 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.061017, -107.635061
This bridge is in worse condition than 54.3% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 10 years old.
Nearby Bridges
IRR BIA RTE 30 over LARGO CANYON WASH
Built 1994
IRR/I-40 EBL/WBL over RINCONADA CREEK
Built 1967
IRR BIA RTE 34 over ACOMA CREEK
Built 1977
IRR BIA RTE 30 over ACOMA RESERVATION WASH
Built 1967
NM-124 over RINCONADA CREEK
Built 1936
NM-124 over UNNAMED WATERWAY
Built 1936
IRR/NM-124 over I-40 EBL/WBL
Built 2018
NM-124 over UNNAMED WATERWAY
Built 1936
IRR/NM-124 over TAFOYA CANYON
Built 1967
IRR BIA RTE 27 over SAN JOSE RIVER
Built 2010
Bridge Details
- Structure #
- 0000M20703B0122
- Year Built
- 2016
- Length
- 12.3 m (40.4 ft)
- Max Span
- 11.4 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 550
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.