IRR BIA RTE 30 over ACOMA RESERVATION WASH
5 KM EAST OF MCCARTYS · County 006, New Mexico · Built 1967 · 2 Lanes · 1,350 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.047811, -107.620833
This bridge is in worse condition than 54.3% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 59 years old.
Nearby Bridges
IRR BIA RTE 34 over ACOMA CREEK
Built 1977
IRR BIA RTE 34 over RINCONADA CREEK
Built 2016
IRR BIA RTE 30 over LARGO CANYON WASH
Built 1994
IRR BIA RTE 34 over SAN FIDEL CREEK
Built 1977
IRR/I-40 EBL/WBL over RINCONADA CREEK
Built 1967
I-40 EBL/Ramp over SAN JOSE CANYON
Built 1967
I-40 EBLS/WBLS over UNNAMED WATERWAY
Built 1967
I-40 WBL over SAN JOSE CANYON
Built 1967
IRR BIA RTE 38 over CANYON LARGO WASH
Built 1977
NM-124 over UNNAMED WATERWAY
Built 1936
Bridge Details
- Structure #
- 00000000000M121
- Year Built
- 1967
- Reconstructed
- 1979
- Length
- 7 m (23 ft)
- Max Span
- 3.4 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,350
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.