IRR BIA RTE 34 over SAN FIDEL CREEK
2.9 KM WEST OF ACOMITA · County 006, New Mexico · Built 1977 · 2 Lanes · 600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
35.059494, -107.5958
This bridge is in worse condition than 94.5% of bridges in County 006. The average bridge in New Mexico is 0 years old; this one is 49 years old.
Nearby Bridges
I-40 EBL/Ramp over SAN JOSE CANYON
Built 1967
I-40 EBLS/WBLS over UNNAMED WATERWAY
Built 1967
I-40 WBL over SAN JOSE CANYON
Built 1967
IRR BIA RTE 34 over ACOMA CREEK
Built 1977
IRR BIA RTE 30 over SAN JOSE RIVER
Built 1997
NM-124 over San Jose Canyon
Built 1936
NM-124 over UNNAMED WATERWAY
Built 1936
IRR BIA RTE 30 over ACOMA RESERVATION WASH
Built 1967
NM-124 over UNNAMED WATERWAY
Built 1936
NM-124 over UNNAMED WATERWAY
Built 1936
Bridge Details
- Structure #
- 00000000000M124
- Year Built
- 1977
- Length
- 18.5 m (60.7 ft)
- Max Span
- 4.3 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.