NM-187 over MONTOYA ARROYO
4.9 MI N OF DONA ANA C/L · County 051, New Mexico · Built 2021 · 2 Lanes · 1,022 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.834322, -107.320547
This bridge is in worse condition than 42.9% of bridges in County 051. The average bridge in New Mexico is 0 years old; this one is 5 years old.
Nearby Bridges
NM-187 over UNNAMED WATERWAY
Built 2021
NM-187 over TRUJILLO CANYON
Built 1929
51-B038 over RIO GRANDE
Built 1966
NM-187 over Rio Grande
Built 2005
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
E GRAND PERCHA RD. over ARREY IRRIGATION CANAL
Built 1936
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over GREEN CANYON
Built 2003
I-25 SBL over Rio Grande River
Built 2003
Bridge Details
- Structure #
- 000000000009828
- Year Built
- 2021
- Length
- 53.8 m (176.5 ft)
- Max Span
- 15.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,022
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $243,000
- Total Project Cost
- $365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.