I-25 NBL/SBL over UNNAMED WATERWAY
5.9 MI N OF DONA ANA CL · County 051, New Mexico · Built 1965 · 4 Lanes · 7,331 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.855892, -107.287419
This bridge is in worse condition than 42.9% of bridges in County 051. The average bridge in New Mexico is 0 years old; this one is 61 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
51-B038 over RIO GRANDE
Built 1966
E GRAND PERCHA RD. over ARREY IRRIGATION CANAL
Built 1936
I-25 SBL over Rio Grande River
Built 2003
I-25 NBL over Rio Grande River
Built 2003
NM-187 over TRUJILLO CANYON
Built 1929
NM-187 over MONTOYA ARROYO
Built 2021
NM-187 over UNNAMED WATERWAY
Built 2021
NM-187 over I-25 NBL/SBL
Built 1965
Bridge Details
- Structure #
- 000000000006631
- Year Built
- 1965
- Length
- 10.2 m (33.5 ft)
- Max Span
- 2.4 m
- Lanes
- 4
- Daily Traffic
- 7,331
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.