51-B038 over RIO GRANDE
1.43M.E & N NM187/N ARREY · County 051, New Mexico · Built 1966 · 2 Lanes · 70 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
32.855844, -107.298925
This bridge is in worse condition than 96.4% of bridges in County 051. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
E GRAND PERCHA RD. over ARREY IRRIGATION CANAL
Built 1936
NM-187 over TRUJILLO CANYON
Built 1929
I-25 SBL over Rio Grande River
Built 2003
I-25 NBL over Rio Grande River
Built 2003
NM-187 over MONTOYA ARROYO
Built 2021
NM-187 over UNNAMED WATERWAY
Built 2021
NM-187 over I-25 NBL/SBL
Built 1965
Bridge Details
- Structure #
- 000000000006680
- Year Built
- 1966
- Length
- 56.1 m (184.1 ft)
- Max Span
- 18.3 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $149,000
- Total Project Cost
- $224,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.