NM-187 over TRUJILLO CANYON
6.2 MI N OF DONA ANA C/L · County 051, New Mexico · Built 1929 · 2 Lanes · 1,093 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
32.851961, -107.319808
This bridge is in worse condition than 80.4% of bridges in County 051. The average bridge in New Mexico is 0 years old; this one is 97 years old.
Nearby Bridges
NM-187 over MONTOYA ARROYO
Built 2021
51-B038 over RIO GRANDE
Built 1966
E GRAND PERCHA RD. over ARREY IRRIGATION CANAL
Built 1936
NM-187 over UNNAMED WATERWAY
Built 2021
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
I-25 SBL over Rio Grande River
Built 2003
I-25 NBL over Rio Grande River
Built 2003
NM-187 over I-25 NBL/SBL
Built 1965
Bridge Details
- Structure #
- 000000000001666
- Year Built
- 1929
- Length
- 61.7 m (202.4 ft)
- Max Span
- 7.6 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,093
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,520,000
- Total Project Cost
- $1,771,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.