49-0587 over LA CIENEGA CREEK
0.9 MI NW OF JCT I-25 · County 049, New Mexico · Built 1992 · 2 Lanes · 3,692 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.554144, -106.440478
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 34 years old.
Nearby Bridges
IRR BIA RTE 88 over RIO GRANDE RIVER
Built 2018
SP85 over UNNAMED WASH
Built 2014
NM-22 over UNNAMED WATERWAY
Built 1954
BIA ROUTE 85 over PERALTA WASH
Built 2016
NM-22 over Rio Galisteo
Built 1954
IRR/NM-22 over LOCAL ROAD
Built 1968
NM-22 over NMRX
Built 1963
NM-22 over Santa Fe River Canyon
Built 1999
NM-22 over Unnamed Waterway
Built 1999
IRR/NM-22 over RIO GRANDE
Built 1973
Bridge Details
- Structure #
- 000000000008781
- Year Built
- 1992
- Length
- 24.7 m (81 ft)
- Max Span
- 23.8 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,692
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.