BIA ROUTE 85 over PERALTA WASH
S COCHITI PUEBLO · County 043, New Mexico · Built 2016 · 2 Lanes · 284 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
35.601467, -106.35575
This bridge is in worse condition than 47.2% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 10 years old.
Nearby Bridges
NM-22 over Santa Fe River Canyon
Built 1999
NM-22 over Unnamed Waterway
Built 1999
IRR/NM-22 over RIO GRANDE
Built 1973
NM-22 over UNNAMED WATERWAY
Built 1954
SP85 over UNNAMED WASH
Built 2014
COCHITI HIGHWAY over WASH
Built 2014
IRR BIA RTE 88 over RIO GRANDE RIVER
Built 2018
NM-22 over Rio Galisteo
Built 1954
49-0587 over LA CIENEGA CREEK
Built 1992
IRR/NM-22 over LOCAL ROAD
Built 1968
Bridge Details
- Structure #
- 0000M20704B0001
- Year Built
- 2016
- Length
- 76.2 m (250 ft)
- Max Span
- 25.5 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 284
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.