NM-22 over Rio Galisteo
4.3 Mi NW of I-25 · County 043, New Mexico · Built 1954 · 2 Lanes · 1,937 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
35.518572, -106.346464
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 72 years old.
Nearby Bridges
IRR/NM-22 over LOCAL ROAD
Built 1968
NM-22 over NMRX
Built 1963
IRR BIA RTE 88 over RIO GRANDE RIVER
Built 2018
SP85 over UNNAMED WASH
Built 2014
NM-22 over UNNAMED WATERWAY
Built 1954
NM-22 over I-25 NBL/SBL
Built 1983
FR-2087 over I-25 NBLS/SBLS
Built 1983
NM-22 over Santa Fe River Canyon
Built 1999
I-25 SBL over Galisteo Creek
Built 1983
I-25 NB/FR over Galisteo Creek
Built 1983
Bridge Details
- Structure #
- 000000000007012
- Year Built
- 1954
- Reconstructed
- 2005
- Length
- 69.2 m (227 ft)
- Max Span
- 9.8 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 1,937
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $310,000
- Total Project Cost
- $950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.