NM-22 over NMRX
4.0 MI NW OF I-25/NM-22 · County 043, New Mexico · Built 1963 · 2 Lanes · 1,937 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
35.514614, -106.345072
This bridge is in worse condition than 96.1% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 63 years old.
Nearby Bridges
IRR/NM-22 over LOCAL ROAD
Built 1968
NM-22 over Rio Galisteo
Built 1954
IRR BIA RTE 88 over RIO GRANDE RIVER
Built 2018
SP85 over UNNAMED WASH
Built 2014
NM-22 over UNNAMED WATERWAY
Built 1954
NM-22 over I-25 NBL/SBL
Built 1983
FR-2087 over I-25 NBLS/SBLS
Built 1983
I-25 SBL over Galisteo Creek
Built 1983
I-25 NB/FR over Galisteo Creek
Built 1983
NM-22 over Santa Fe River Canyon
Built 1999
Bridge Details
- Structure #
- 000000000007011
- Year Built
- 1963
- Length
- 48.2 m (158.1 ft)
- Max Span
- 15.2 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 1,937
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $310,000
- Total Project Cost
- $530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.